The Research and Production Association «GYPROGAZ» - Background

We implement integrated projects for such applications as treatment of hydrocarbon gas, hydrocarbons emission control, air separation and air handling.

We adapt the best practices of international oil and gas market leaders to the Russian realities. We look to the future and put all our efforts so not just to follow the crowd but to be the best.
Brief and to the point
10 projects
of the oil and gas industry participated by our employees
11 years
work experience of our employees in the oil/gas industry
Prepare the solution.
Supply and commission equipment
Assist in resolution of the objectives as follows:
Conditioning of the fuel gas for gas-fueled reciprocating power plants and gas piston drives
Raising of the methane number for 15 units
Conditioning of the net calorific power to the required value.
Gas stripping of hydrogen sulphide H2S
Fuel gas conditioning for gas turbine plants and turbine drives
Bringing the DPT to the required value.
Gas stripping of hydrogen sulphide H2S
Gas compression.
Gas treatment for supply to gas mains of Gazprom (Gazprom Company Standard СТО ГАЗПРОМ 089−2010)
Ensuring the required water and hydrocarbons DPT.
СО2 content reduction by 10 times down.
Hydrogen sulphide and mercaptanes reduction.
Gas treatment for industrial and municipal applications (the National Standard GOST 5542−2014)
Bringing the Wobbe index (upper) to the required value.
Hydrogen sulphide and mercaptanes reduction.
Gas-gasoline processing.
Gas compression.
Separation of СО2
1
2
4
3
What other objectives we resolve
Stages of cooperation
Send your request, and our manager will call you back and inquire into your needs in the general outline. Thereafter we jointly coordinate the time and venue for our meeting, or the time of our call so to ;specify the details of your objective.
Presentation meeting – 30 minutes
Stage 1
Send your request, and our manager will call you back and inquire into your needs in the general outline. Thereafter we jointly coordinate the time and venue for our meeting, or the time of our call so to specify the details of your objective.
Presentation meeting – 30 minutes
Stage 1
When necessary our project manager and technical expert will visit you and study your needs in details.
Initial data collection and acquisition – 2 days and more
Stage 2
Our technical/commercial proposal will be prepared in the view of your needs and the initial data received. Sending it to you for your approval.
Preparation of our technical/ commercial proposal – 7 days and more
Stage 3
After the TCP is approved, we shall hold a tender for selection of the supplier. Signing of Supply and Works Contract.
Approval of the proposal and Contract signing —20 days and more
Stage 4
Our engineers design your equipment
Design engineering – 30 days and more
Stage 5
The equipment will be custom - built to you request.
Manufacture of the equipment — 90 days and more
Stage 6
Road, sea or railway transportation of the equipment to your site.
Delivery — 2 days and more
Stage 7
Onsite assembly of the equipment supplied.
Assembly — 15 days and more
Stage 8
We perform precommissioning activities.
Commissioning — 10 days and more
Stage 9
After startup and bringing your equipment to operation, we provide you with our free advisory support during its whole service life on any issues that may arise.
Technical support — has no expiration date
Stage 10
After startup and bringing your equipment to operation, we provide you with our free advisory support during its whole service life on any issues that may arise.
Technical support — has no expiration date
Stage 10
Eventually you receive the project ready for operation
6 months and more
for the projects related to nitrogen and air stations
13 months and more
for hydrocarbon projects
Describe your objective
Or ask us
And get recommendations on different options available for its implementation
Разработано в